(1) If the duration of superficies has not been determined by a contract, the period shall be the shortest period mentioned in the preceding Article.
(2) If, when the superficies was created, the kind and construction of the structure were not determined, the superficies shall be regarded as the type of building mentioned in subparagraph 2 of the preceding Article.